Barrick Gold Mine |
Barrick Gold Mine Jobs 2023
FIRE PREVENTION AND SUPPRESSION ON CRITICAL PROCESS PLANT EQUIPMENT’S
North Mara Gold Mine, a fully owned subsidiary of Twiga Minerals Corporation,
which is ultimately owned by Barrick Gold Corporation and the Government of the
United Republic of Tanzania requests the submission of Tenders from reputable,
experienced, certified and qualified parties to provide the following services:
Design, install and commission of Powerhouse Engines Fire suppression system to each Generators, Compressor room and Elution oil heaters.
Recommended:
PAST PAPERS ZA DARASA LA 7 MPAKA FORM SIX | NECTA AND MOCK EXAMS 1988 - 2019. CLICK HERE!
Tender Ref: NM009/2023
Pre-qualification criteria
- Evidence of suitable HSE, OSHA compliance and site safety program.
- Copy of registration and incorporation certificate.
- Past experience on similar projects by having list of clients with LPO/ signed contract and certificate of completion.
- Experiences on fire suppression system and quality control methodology.
- Compliance with local content regulation by having local content plan approved by mining commission.
- Evidence of suitable resources availability – equipment, systems, and qualified personnel (Applicators & Inspectors) on corrosion protection.
- Download Your National ID (NIDA) Number Here | Download NAMBA NA KITAMBULISHO CHAKO CHA NIDA. BONYEZA HAPA!
- Free CV Writing and Download, Cover/Job Application Letters, Interview Questions and It's Best Answers plus Examples. Click Here!
- CHECK SCHOLARSHIPS OPPORTUNITIES TO STUDY ABROAD CLICK HERE!
- NEW TANZANIAN JOBS, INTERNSHIPS AND VOLUNTEERING OPPORTUNITIES 2023 (1,121 POSTS)
Expression of interest
If your company meets the pre-qualification criteria and would like to be considered to receive the invitation to tender (ITT), an expression of interest (EOI) including your company profile and evidence of compliance with pre-qualification criteria may be submitted to nm.proposal@barrick.com.
Applicants must quote reference “NM Fire Protection System” in the subject line of your email.
Key Dates Last date to submit EOI 23 March 2023
North Mara Gold Mine Limited
No comments:
Post a Comment